An infrastructure project of this scale and complexity, the largest in Europe to date, would require major engineering innovation and extensive private financing. The initial assignment was to analyze the proposed construction contract, cost estimates and other documents to identify potential risks and prepare an initial report used as the basis for negotiating the final contract documents.

Channel tunnel project

This link consists of three parallel tunnels running for 39 km Two Main Rail Tunnels, about 30 m 98 ft apart, carry trains from the north and from the south. In between the two tunnels is the Channel Service Tunnel, which is connected by cross-passages to the main tunnels. This service tunnel allows maintenance workers to access the rail tunnels at regular intervals.

TBMs were deployed at both the U. Geology The majority of the Channel Tunnel passes through chalk marl, much of it faulted.

Below the Chalk Channel tunnel project is a thin 2 m 6. This rock is a weak sandstone with a stronger rock strength than the Chalk. The bottom of the tunnels pass through stiff clay with some swelling characteristics. The Chalk is much more faulted and prone to water inflows on the French side of the tunnels.

TBMs Robbins built five machines for this project, each designed for the geology of a specific length of tunnel. These machines featured sealed cutter chambers to withstand high water pressures and screw conveyors to carry the cut material from the face.

These 1, tonne 1, ton8. This machine featured a 5. Robbins designed these machines to withstand unstable and faulted rock conditions. The machines generated a maximum 5, N-m 4, lb-ft of torque.

Channel tunnel project

Tunnel Excavation Machines were deployed on both sides of the tunnels in December The three French seaward TBMs encountered water inflows almost immediately, forcing the use of the sealed mode of operation much earlier than anticipated.

The sealed cutterheads of the machines could withstand 10 bar psi of water pressure; however, additional measures were required to seal the remainder of the machines against water inflow.

The tail shields of the TBMs were fitted with multiple rows of wire brush seals that pressed against the outside diameter of the concrete segment lining. Grease was injected into wire brushes and the mm 4 in space between the metallic brushes and the tunnel lining.

Grout lines were fitted into the tail shield allowing fine cement grout to be injected into the mm 6 in annulus between the tunnel lining and the ground. This method sealed the tunnel lining as the TBMs advanced. In spite of the difficult conditions, advance rates improved throughout the boring with the Robbins service tunnel machine averaging m 2, ft per month for the project.

Unforeseen water inflows in a 3. After passing through this section of tunnel, the machines experienced no further difficulties and began averaging m ft a week. The Robbins machines on the U.

Muck transport on both sides of the tunnel was complicated but worked well. The conveyor then dumped the muck into lagoons behind sea walls in the English Channel. In all, about 4 million m3 5. The area, called Samphire Hoe, is now a popular park.

On the French side muck was crushed and mixed with water in a chamber at the bottom of the Sangette access shaft. It was then pumped up the shaft and behind a TBM was turned aside and buried.The project was 19 months late and had a cost overrun of some US$3 billion (total construction cost of US$ billion).

On 1 December , Englishman Graham Fagg and Frenchman PhillippeCozette broke through the service tunnel with the media watching.

Introduction:

The Channel Tunnel Project Management Matt Walter 4 (Chang, ). Chang stresses the importance of both the government and financial institutes in the CTRL project. The article also stresses the importance that milestones would have been essential on the development of the project charter.

The Channel Tunnel is a kilometer (mile) railway tunnel under the English Channel that links the United Kingdom and France. It is the third longest railway tunnel in the world, surpassed only by the Gotthard Base Tunnel in Switzerland and the Seikan Tunnel in Japan, and has the world’s longest undersea section — kilometers ( miles).

The Channel Tunnel that was never built The ‘Chunnel’ may be the UK’s most famous underwater tunnel, but the British have been trying to dig to Europe since – and plans still remain.

Destinations

The Channel Tunnel is also known as the Euro Tunnel and it is a rail link beneath the English Channel between Cheriton next to Folkestone, Kent, and Coquelles close to Calais.

The Channel tunnel is said to be one of the biggest civil engineering projects of the 20th century. Channel Tunnel: Introduction The Channel tunnel project undertaken to create a connection between England and France via underground tunnel, presents one of the largest privately funded construction projects ever under taken.

Channel Tunnel - Wikipedia